
Antony, winch and Robert (10/10/2004)
|

Antony Winch fettling (10/10/2004)
|

Dig entrance shaft (10/10/2004)
|

Looking down the entrance shaft (10/10/2004)
|

Robert and Antony testing out the winch (10/10/2004)
|

Responsible father ties lifeline (14/11/2004)
|

Michael top of shaft (14/11/2004)
|

Michael descends (14/11/2004)
|

Father and son (14/11/2004)
|

Martin reappears after digging (14/11/2004)
|

Tiggy at dig level (05/12/2004)
|

View up shaft to surface (05/12/2004)
|

Paul and Dave looking down (05/12/2004)
|

Dig face and crow bar (05/12/2004)
|

Cassie side passage (06/03/2005)
|

Cassie side passage (06/03/2005)
|

Shaft bottom looking up (06/03/2005)
|

Cassie on the ladder (06/03/2005)
|

Matt on the surface (06/03/2005)
|

Surface crew (09/04/2005)
|

Milche (09/04/2005)
|

Antony gets the brews on (09/04/2005)
|

Dave top of the shaft (09/04/2005)
|

Sean after digging (09/04/2005)
|

The Cod (09/04/2005)
|

Senior members take control (09/04/2005)
|

Dave, what a trip (09/04/2005)
|

Paul draws up the survey (09/04/2005)
|

Matt in the rift (12/08/2005)
|

Matt in the crawl towards the rift (12/08/2005)
|

Tiggy descends the ladder - 1 (09/09/2005)
|

Tiggy descends the ladder - 2 (09/09/2005)
|

Tiggy descends the ladder - 3 (09/09/2005)
|

Tony Jarratt looks up passage (09/09/2005)
|

Matt looks up passage (09/09/2005)
|

Tiggy looks up passage (09/09/2005)
|

Butch's crotch (09/09/2005)
|

Tony Jarratt drilling (09/09/2005)
|

Butch top of shaft (10/09/2005)
|

View down shaft (10/09/2005)
|

Shaft recess digging (10/09/2005)
|

Concrete pipe rolling (10/09/2005)
|

Concrete pipe loading (10/09/2005)
|

Concrete pipes unloaded (10/09/2005)
|

Concrete plinth fitting (10/09/2005)
|

Antony in shaft (10/09/2005)
|

Final adjustments (10/09/2005)
|

Load testing the concrete plinths (11/09/2005)
|

Antony drills a hole (11/09/2005)
|

Pipe installation - failed attempt 1 (11/09/2005)
|

Pipe installation - failed attempt 2 (11/09/2005)
|

JCB to the rescue (11/09/2005)
|

JCB pipe installation - 1 (11/09/2005)
|

JCB pipe installation - 2 (11/09/2005)
|

Antony unties the rope (11/09/2005)
|

Installation complete (11/09/2005)
|

Surface crew (13/11/2005)
|

Ray descends (13/11/2005)
|

Hazel lowering the cable (13/11/2005)
|

Jo descends (13/11/2005)
|

View down shaft (13/11/2005)
|

Robert tidying (13/11/2005)
|

Jo ascends (13/11/2005)
|

Jo on the surface (13/11/2005)
|

Paul lifelines (13/11/2005)
|

Paul crawl from entrance shaft (02/02/2007)
|

Tiggy crawl to junction (02/02/2007)
|

Tiggy at junction (02/02/2007)
|

Paul Gibbetted! (02/02/2007)
|